Bharatmala Pariyojana Programme

Background

  • In the year 2000, the government launched the National Highways Development Programme (NHDP).
    • It aimed to upgrade and widen 13,150 km of highways through 7 phases.
    • But by 2017, it became clear that India’s economy and logistics required a bigger, more integrated highway programme.
  • Thus, in 2017, the Bharatmala Pariyojana was launched as an umbrella programme to reorganize and expand highway development on a corridor-based approach.

Purpose and Tenure

  • Purpose: To optimize freight and passenger movement efficiency across India by bridging critical infrastructure gaps.
  • Duration: Initially aimed to finish by 2022, but extended till 2027–28.

Implementing Agencies

  • NHAI (National Highways Authority of India)
  • NHIDCL (National Highways and Infrastructure Development Corporation Limited)
  • State PWDs and State Road Development Corporations

Monitoring is done by the Public Investment Board (PIB), which reviews progress every six months to prevent cost and time overruns.

Approach

Unlike NHDP’s package-based approach, Bharatmala adopts a corridor approach:

  • It focuses on developing Economic Corridors, National Corridors, and Feeder Routes in an integrated way.
  • This ensures seamless connectivity, not just scattered projects.

Focus areas:

  1. Better use of existing infrastructure.
  2. Multi-modal integration (linking roads with railways, ports, airports).
  3. Filling connectivity gaps.
  4. Linking National and Economic Corridors for efficiency.

Salient Features

  • Funding: Mostly Central Government, mobilised by the Ministry of Road Transport & Highways (MoRTH).
  • Grand Challenge Mechanism:
    • If States make land available quickly, projects can be taken up on fast-track.
    • 10% funds earmarked for this.
    • Each State can propose 2 stretches of up to 100 km in a financial year.
  • Cost Sharing: Projects outside Bharatmala Phase-I can only be taken if States pay 50% of land acquisition cost.
  • PPP Promotion: Monetisation of roads built under EPC (Engineering, Procurement, Construction) route through the Toll-Operate-Transfer (ToT) model.

Additional Measures

  • Resolution of Blackspots:
    5,785 accident-prone blackspots identified for removal.
  • Greenfield alignments: New roads to be built avoiding populated areas, cutting land costs.
  • Wayside amenities: Rest stops and cargo facilities every half hour.
  • Access-controlled expressways: Pay-per-use tolling with closed tolling systems.

Digital & Monitoring Systems

To bring transparency and speed, multiple online platforms are integrated:

  1. PMIS (Project Monitoring Information System) → for real-time tracking.
  2. Bhoomi Raashi → land acquisition notifications online.
  3. BIMS (Bidder Information Management System) → central database for bidders.
  4. Lakshya → performance monitoring system of NHAI officers.
  5. ERP System → integrates MoRTH, NHAI, and NHIDCL functions.

Big Picture

Bharatmala is not just a road project; it is India’s strategic highway revolution.

  • It integrates economic needs (freight movement), social needs (passenger convenience), and strategic needs (border roads).
  • It combines funding innovation (ToT, PPP) with digital monitoring.
  • It shifts focus from simply building roads to creating a national highway network that boosts trade, tourism, security, and connectivity in one sweep.

📌 In UPSC terms: Bharatmala represents the second generation of highway reforms, just as NHDP was the first.

🎯 Deepen Your Understanding: Related Articles for You!

  • Voluntary Vehicle Fleet Modernization Programme (VVMP)

    Background & Purpose 📌 Target: Scrapping around 1 crore unfit vehicles, not based on age, but strictly on their fitness condition. Objectives Salient Features (a) Certificate of Deposit (CoD) (b) Automated Testing Stations (ATSs) (c) Registered Vehicle Scrapping Facilities (RVSFs) Incentive–Disincentive Strategy This is the heart of the programme. To encourage people to voluntarily scrap…

  • Vigyan Dhara Scheme

    Quick Facts 👉 In short, this scheme is about boosting India’s scientific capacity, research, innovation, and global collaborations. Objectives The scheme is designed around four major objectives: Salient Features – Components (A) S&T Institutional and Human Capacity Building 👉 Focus: Build strong institutions + nurture scientific talent. (B) Research & Development 👉 Focus: Ensure India…

  • UNNATI Scheme

    Background & Rationale The North-Eastern Region (NER) of India has always been strategically important but economically lagging compared to other parts of the country. Industrialization has been weak due to lack of infrastructure, investment hesitancy, and geographical challenges. To address this, the government introduced UNNATI, 2024 i.e. Uttar Poorva Transformative Industrialization Scheme. The scheme focuses…

  • Ude Desh ka Aam Naagrik (UDAN)

    Also called the Regional Connectivity Scheme (RCS). Context and Purpose For decades, air travel in India was seen as a luxury—affordable only to a small section of society. Large parts of the country, especially small towns, hilly areas, and the North-East, were left disconnected from air services. 👉 To correct this imbalance, the Government launched…

  • Swadesh Darshan 2.0

    Background and Context In India, tourism is not just about leisure—it is also a source of economic growth, cultural preservation, and job creation. To harness this potential, the government launched the Swadesh Darshan Scheme in 2015. Under this, 76 projects were sanctioned to develop theme-based tourist circuits. Now, the scheme has been revamped into Swadesh…

  • Swachh Bharat Mission (Grameen) Phase II

    Context – From ‘Toilet Construction’ to ‘Total Cleanliness’ The first phase of Swachh Bharat Mission (SBM-Grameen) was revolutionary—it mobilized rural India to construct over 10 crore toilets, leading to 100% ODF (Open Defecation Free) declarations by 2nd October 2019, Mahatma Gandhi’s 150th birth anniversary. But building toilets is only the starting point. The challenge now…

Leave a Reply

Your email address will not be published. Required fields are marked *